Construction Glossary

Quick reference for terminology appearing in calculators, results, and project guides. Spanish translations appear in the Spanish glossary page.

Board foot
A lumber volume unit equal to 144 cubic inches — commonly used for hardwood pricing.
Bundle (roofing)
A packaged unit of asphalt shingles; typically three bundles cover one roofing square.
Coverage rate
Area a material covers per unit (e.g., square feet per gallon of paint).
Cubic yard (yd³)
US volume measure equal to 27 cubic feet; common for concrete, mulch, and bulk soil.
On center (OC)
Spacing measured from the center of one framing member to the next (e.g., 16 in OC studs).
Pitch (roof)
Roof slope expressed as rise over run (4/12 means 4 in rise per 12 in horizontal run).
R-value
Thermal resistance of insulation; higher numbers mean better resistance to heat flow.
Riser
Vertical face of a stair step between treads.
Roofing square
100 square feet of roof area; shingle orders often reference squares.
Tread
Horizontal walking surface of a stair step.
Waste factor
Extra material percentage added to net quantity to cover cuts, breakage, and errors.
Markup
Percentage added to cost to reach selling price (markup% of cost).
Margin
Profit as a percentage of selling price (different from markup).
BTU
British Thermal Unit — heat energy rate used to size heating and cooling equipment.
Manual J
ACCA standard for residential HVAC load calculation; more detailed than rule-of-thumb sizing.
Premix concrete
Dry concrete mix in bags requiring water on site; yield varies by bag weight.
Roll-off dumpster
Open-top waste container delivered for construction debris; sized in cubic yards.